Operating manual
SUNNY HIGHPOWER PEAK3
SHP 100-20 / SHP 150-20
- Information on this Document
- Safety
- Scope of Delivery
- Additionally Required Materials and Equipment
- Product Overview
- Mounting and Preparing the Connection
- Electrical Connection
- Commissioning
- Operation
- Establishing a connection to the user interface
- Logging In and Out of the User Interface
- Start Page Design of the User Interface
- Starting the Installation Assistant
- Switching the Dynamic Power Display Off
- Changing the Password
- Changing Operating Parameters
- Configuring the Country Data Set
- Configuring the Active Power Mode
- Configuring Q on Demand 24/7
- Configuring the Modbus Function
- Saving the Configuration in a File
- Adopting a Configuration from a File
- Updating the Firmware
- Disconnecting the Inverter from Voltage Sources
- Clean the product
- Troubleshooting
- Decommissioning the Inverter
- Procedure for Receiving a Replacement Device
- Technical Data
- Contact
- EU Declaration of Conformity