Operating manual
SUNNY BOY STORAGE 3.7 / 5.0 / 6.0
- Information on this Document
- Safety
- Scope of Delivery
- Product Overview
- Mounting
- Electrical Connection
- Overview of the Connection Area
- Grounding
- AC Connection
- Connecting the Network Cables
- Connecting the energy meter
- Connecting CAN communication cable
- Connecting the switch and outlet for secure power supply operation
- Connecting Switch for black start (in battery-backup systems)
- DC Connection
- Commissioning
- Operation
- Establishing a connection to the user interface
- Logging In and Out of the User Interface
- Start Page Design of the User Interface
- Displaying and Downloading the Stored Data
- Starting the Installation Assistant
- Secure power supply operation
- Checking or Disabling Battery-Backup Operation
- Activate WPS Function
- Switching WLAN On and Off
- Changing the Password
- Changing Operating Parameters
- Configuring the Country Data Set
- Configuring the Active Power Mode
- Configuring Battery and Automatic Transfer Switching Device
- Disabling Battery Charging by PV System in Battery-Backup Operation Mode
- Configuring the Modbus Function
- Activating the Receipt of Control Signals (Only for Italy)
- Deactivating Grounding Conductor Monitoring
- Configuring the Energy Meter
- Saving the Configuration in a File
- Adopting a Configuration from a File
- Firmware Update
- Disconnecting the Inverter from Voltage Sources
- Clean the product
- Troubleshooting
- Decommissioning the Inverter
- Procedure for Receiving a Replacement Device
- Technical Data
- Contact
- EU Declaration of Conformity
- UK Declaration of Conformity